Recent Questions (Last 90 Days)

ID Problem Title State Date Asked
1277 AGT minimum length OH December 5, 2018
1275 Standard MGS W-Beam with Weak Soil IN November 27, 2018
1262 Bridge Pier and other nearby hazards SC October 17, 2018
1270 Anchored PCB placed behind free standing crash cushion - Shielding Piers UT October 9, 2018
1265 Guardrai Post alignment and which post bolt hole to utilze October 4, 2018
1263 Mis-fabricated Stirrup for Barrier Rail, RFI 90, Project IM-NHS-074-1(199)5--03-82, 2274' Welded Girder Bridge-WBL IA October 3, 2018
1259 Approach Guardrail Transition Attach to 8" Concrete Sidewalk NJ September 27, 2018
1258 Shorten MGS Post Length to Bridge Guardrail over Two Large Pipes IN September 19, 2018

Archive

Question Archives by Year
2018
2017
2016
2015
2014
2013
2012
2011
2010
2009
2008
2007
2006
2005
2004
Contact Us:
130 Whittier Research Center
2200 Vine Street
Lincoln, NE 68583-0853
(402) 472-0965
Email: mwrsf@unl.edu
Disclaimer:
The information contained on the Midwest Roadside Safety Facility (MwRSF) website is subject to change without prior notice. The University of Nebraska and the MwRSF is not responsible or liable, directly or indirectly, for any damage or loss caused or alleged to be caused by or in connection with the use or misuse of or reliance upon any such content, goods, or services available on this site.