How much of a 2:1 do we need behind a beam guard post

Question
State WI
Description Text

There is a project that may have to install beam guard near a body of water.  The are asking how far down the slope do they need to carry the 2:1?

 

I know that the attached drawing show 2.5:1.

Keywords
  • Guardrail
Other Keywords grading
Date November 1, 2012
Attachment Pages from guardrail-options (2).pdf


Response
Response We would recommend that a minimum of 4 ft of the 2:1 slope be maintained prior to switching to a steeper slope. This length should provide sufficient soil at the 2:1 slope to resist post rotation in a manner similar to the continuous 2:1 slope that was tested. 
Date November 1, 2012


Contact Us:
130 Whittier Research Center
2200 Vine Street
Lincoln, NE 68583-0853
(402) 472-0965
Email: mwrsf@unl.edu
Disclaimer:
The information contained on the Midwest Roadside Safety Facility (MwRSF) website is subject to change without prior notice. The University of Nebraska and the MwRSF is not responsible or liable, directly or indirectly, for any damage or loss caused or alleged to be caused by or in connection with the use or misuse of or reliance upon any such content, goods, or services available on this site.