Question Archive: 2009

ID Problem Title State Date Asked Date Last Answered
350 Longer Posts for Guardrail Adjacent to Steep Slopes IL December 29, 2009 January 4, 2010
346 MGS with 1/4-Post Spacing to Shield Hazard and Placement Guidelines December 18, 2009 January 6, 2010
348 Cable End Terminal Anchor Bracket NE December 10, 2009 December 17, 2009
364 Low Tension Cable End Terminal Details NE December 10, 2009 December 15, 2009
353 TL-5 Concrete Barrier IL November 30, 2009 February 2, 2010
360 54” Concrete Barrier IA November 30, 2009 December 11, 2014
352 Pipe Runners (Safety End Treatment) For Skewed Culverts November 20, 2009 January 4, 2010
367 Trailing End Terminal November 18, 2009 December 7, 2009
370 MGS Bridge Approach Transition NE October 5, 2009 October 6, 2009
366 PCB Tie-Down Applications WI September 18, 2009 September 21, 2009
369 TCB to Bridge Rail Connection IA September 2, 2009 October 2, 2009
368 MGS Posts in Asphalt August 31, 2009 September 25, 2009
380 Guardrail Over Culvert Weld Detail IL August 11, 2009 August 12, 2009
381 Wood and Steel Posts in a Run of Beam Guardrail WI July 21, 2009 August 26, 2009
379 MGS with Gutter Curb July 16, 2009 July 20, 2009
377 New Jersey Shape PCB Anchorage OH July 13, 2009 July 16, 2009
372 Termination and Anchorage for TCB IL July 9, 2009 September 23, 2009
382 TL-2 - Low Profile Barrier WI July 9, 2009 July 14, 2009
539 Transitioning 31 DC June 24, 2009 April 4, 2012
389 W-Beam Guardrail Over Culvert KS June 18, 2009 June 24, 2009
385 Guardrail Blockouts WI June 10, 2009 June 11, 2009
334 Steel Bridge Railing Question IA June 3, 2009 July 15, 2010
386 Bridge Rail Gap Size NE June 3, 2009 June 8, 2009
392 Guardrail Bolt Length WI May 29, 2009 June 15, 2009
394 Iowa Transition Design Adaptation IA May 18, 2009 May 19, 2009
393 New MGS Transition and Wood Post Inventory IA May 11, 2009 May 12, 2009
390 Questions on Thrie beam transitions, nesting of beam guard and thrie beam barrier WI April 10, 2009 April 14, 2009
402 SSCB Thrie Beam Transition WI February 9, 2009 February 11, 2009
401 Summary of Maximum Deflections for Beam Guard and Thrie Beam WI January 29, 2009 February 2, 2009
396 MwRSF TCB January 23, 2009 January 26, 2009
399 Butterfly Delineators KS January 15, 2009 March 24, 2009

Question Archives by Month
January 2009
February 2009
March 2009
April 2009
May 2009
June 2009
July 2009
August 2009
September 2009
October 2009
November 2009
December 2009
Contact Us:
130 Whittier Research Center
2200 Vine Street
Lincoln, NE 68583-0853
(402) 472-0965
Email: mwrsf@unl.edu
Disclaimer:
The information contained on the Midwest Roadside Safety Facility (MwRSF) website is subject to change without prior notice. The University of Nebraska and the MwRSF is not responsible or liable, directly or indirectly, for any damage or loss caused or alleged to be caused by or in connection with the use or misuse of or reliance upon any such content, goods, or services available on this site.