Question Archive: 2005

ID Problem Title State Date Asked Date Last Answered
483 Long Span and Short-Radius Guardrail OH November 8, 2005 November 23, 2005
486 Median Cable Guardrail / Bullnose NE October 7, 2005 November 3, 2005
488 F-Shape PCB Transition to Rigid Barrier – Thrie Beam Splice FL October 5, 2005 October 31, 2005
490 Type F Barrier Height Transitions MO April 13, 2005 April 21, 2005
497 Temporary Concrete Barrier LON KS March 9, 2005 March 15, 2005
500 Very Shallow Guardrail Post at Subsurface Obstruction MO February 10, 2005 February 11, 2005
498 USH 12 Lake Delton Vertical Concrete Barrier WI January 18, 2005 January 19, 2005

Question Archives by Month
January 2005
February 2005
March 2005
April 2005
May 2005
June 2005
July 2005
August 2005
September 2005
October 2005
November 2005
December 2005
Contact Us:
130 Whittier Research Center
2200 Vine Street
Lincoln, NE 68583-0853
(402) 472-0965
Email: mwrsf@unl.edu
Disclaimer:
The information contained on the Midwest Roadside Safety Facility (MwRSF) website is subject to change without prior notice. The University of Nebraska and the MwRSF is not responsible or liable, directly or indirectly, for any damage or loss caused or alleged to be caused by or in connection with the use or misuse of or reliance upon any such content, goods, or services available on this site.