Question Archive: May 2013

ID Problem Title State Date Asked Date Last Answered
707 Tolerances for Timber Posts WY May 31, 2013 June 3, 2013
729 MGS attached to concrete paving or deck May 22, 2013 May 22, 2013
706 10 Foot NJ Temporary Concrete Barrier on Bridge Deck, 30 mph Speed WY May 21, 2013 May 21, 2013
727 Curbs at bridge rail approach transitions IA May 21, 2013 May 21, 2013
714 MGS Thrie Beam Median Barrier WI May 19, 2013 May 23, 2013
704 MASH bridge rails WI May 13, 2013 May 13, 2013
701 blocked MGS in front of a retaining wall WI May 10, 2013 May 30, 2013
710 MGS BLOCK ROTATION May 8, 2013 May 28, 2013
694 welded beam guard atttachment to low-fill culverts WI May 2, 2013 May 15, 2013
693 cable barrier line post footing design WI May 2, 2013 May 13, 2013
709 Guardrail on Soil Nail Walls WA May 1, 2013 May 1, 2013
723 Backup Plates OH May 1, 2013 May 1, 2013
730 Swapping MGS post locations at obstructions IA May 1, 2013 June 13, 2013

Contact Us:
130 Whittier Research Center
2200 Vine Street
Lincoln, NE 68583-0853
(402) 472-0965
Email: mwrsf@unl.edu
Disclaimer:
The information contained on the Midwest Roadside Safety Facility (MwRSF) website is subject to change without prior notice. The University of Nebraska and the MwRSF is not responsible or liable, directly or indirectly, for any damage or loss caused or alleged to be caused by or in connection with the use or misuse of or reliance upon any such content, goods, or services available on this site.