ID Problem Title State Date Asked Date Last Answered
544 Steel backed timber transition to rigid barrier WI April 25, 2012 May 3, 2012
543 Asphalt Width under TCB Transition to Bridge IA April 25, 2012 April 26, 2012
542 TL-2 permanent concrete barrier WI April 25, 2012 April 25, 2012
541 Median width WI April 25, 2012 May 2, 2012
540 Clear Zone for Roadways with Design Speed of 70 mph WI April 25, 2012 September 28, 2012
626 Guardrail Need paper by Wolford and Sicking KS April 23, 2012 April 24, 2012
676 MWTSP with vertical-faced bridge rail IA April 11, 2012 April 12, 2012
611 Anchoring Temporary Barriers over Bridge Expansion Joints MN April 7, 2012 April 13, 2012

Contact Us:
130 Whittier Research Center
2200 Vine Street
Lincoln, NE 68583-0853
(402) 472-0965
Email: mwrsf@unl.edu
Disclaimer:
The information contained on the Midwest Roadside Safety Facility (MwRSF) website is subject to change without prior notice. The University of Nebraska and the MwRSF is not responsible or liable, directly or indirectly, for any damage or loss caused or alleged to be caused by or in connection with the use or misuse of or reliance upon any such content, goods, or services available on this site.